首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
电工技术   1篇
  2009年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
Scheduling of Spinning Reserve Considering Customer Choice on Reliability   总被引:1,自引:0,他引:1  
One of the main objectives of power system restructuring and deregulation is to allow customers to select their desired reliability. This paper proposes a new market model where the reserve capacity is scheduled based on the desired risk level of customers, that is recognized by the expected load not supplied (ELNS) index. The reliability constraint in the objective function of reserve procurement is formulated as a function of generation and reserve allocation among the generating units as well as their failure probability. The reserve requirement is determined regarding transmission constraints and load curtailments due to transmission congestion. Therefore, this method produces market-clearing results with the desired probabilistic characteristics. Moreover, it is shown that the load shedding procedure in contingency states affects the assessment of reserve. The Roy Billinton test system (RBTS) and the IEEE reliability test system (RTS) are analyzed to illustrate the technique.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号