首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
综合类   1篇
自动化技术   2篇
  2012年   2篇
  1995年   1篇
排序方式: 共有3条查询结果,搜索用时 0 毫秒
1
1.
This paper presents a novel divide-and-integrate strategy based approach for solving large scale job-shop scheduling problems. The proposed approach works in three phases. First, in contrast to traditional job-shop scheduling approaches where optimization algorithms are used directly regardless of problem size, priority rules are deployed to decrease problem scale. These priority rules are developed with slack due dates and mean processing time of jobs. Thereafter, immune algorithm is applied to solve each small individual scheduling module. In last phase, integration scheme is employed to amalgamate the small modules to get gross schedule with minimum makespan. This integration is carried out in dynamic fashion by continuously checking the preceding module's machine ideal time and feasible slots (satisfying all the constraint). In this way, the proposed approach will increase the machine utilization and decrease the makespan of gross schedule. Efficacy of the proposed approach has been tested with extremely hard standard test instances of job-shop scheduling problems. Implementation results clearly show effectiveness of the proposed approach.  相似文献   
2.
高斯扩散模式在实际应用中平均风速的取值混乱,本文从理论上阐明的合理取值应为有效源高He处的平均风速(),并指出了采用地面风速或烟囱出口高度处平均风速()计算污染物地面浓度的误差范围。  相似文献   
3.
In this paper, an effective bi-population based estimation of distribution algorithm (BEDA) is proposed to solve the flexible job-shop scheduling problem (FJSP) with the criterion to minimize the maximum completion time (makespan). The BEDA stresses the balance between global exploration and local exploitation. In the framework of estimation of distribution algorithm, two sub-populations are used to adjust the machine assignment and operation sequence respectively with a splitting criterion and a combination criterion. At the initialization stage, multiple strategies are utilized in a combination way to generate the initial solutions. At the global exploration phase, a probability model is built with the superior population to generate the new individuals and a mechanism is proposed to update the probability model. At the local exploitation phase, different operators are well designed for the two sub-populations to generate neighbor individuals and a local search strategy based on critical path is proposed to enhance the exploitation ability. In addition, the influence of parameters is investigated based on Taguchi method of design of experiment, and a suitable parameter setting is determined. Finally, numerical simulation based on some widely used benchmark instances is carried out. The comparisons between BEDA and some existing algorithms as well as the single-population based EDA demonstrate the effectiveness of the proposed BEDA in solving the FJSP.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号