首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
建筑科学   1篇
冶金工业   1篇
  2009年   1篇
  1994年   1篇
排序方式: 共有2条查询结果,搜索用时 15 毫秒
1
1.
Where faulting takes place due to the absence of dowel bars and inadequate subbase support in jointed concrete pavement (JCP), dowel bar retrofit (DBR) is used to improve load transfer efficiency (LTE) and to prevent further faulting of slabs at transverse joints. Even though DBR generally improves LTEs and overall performance of JCPs, not all DBR projects have been successful. Faulting reoccurred within 2?years after DBR treatment on US59 in Texas. An investigation from the cores taken in the project revealed excessive voids under a dowel bar due to poor consolidation of the grouting material. A laboratory investigation was performed to determine the most critical factors for adequate consolidation of grouting materials in DBR. Typical rapid-setting grout materials widely used in DBR were selected and full-scale specimens were made for evaluations. Four testing variables for consolidation performance were investigated: time of placement after mixing, vibration time, slot width, and maximum aggregate size. Maximum aggregate size and slot width were not critical factors for consolidation performance of grout. The most significant factor was vibration time. Twenty s of vibration is recommended. Placement time was also an important factor, with grout materials placed after initial set performing poorly. Delayed placement of grout materials without vibration led to the most voids under the dowel bars.  相似文献   
2.
沈继仁 《新建筑》1994,(2):15-22
通过北京“国宾花园”的设计,论述了大城市繁华地段改造规划设计的特点,并就如何达到改造资金的平衡,变建筑的单栋设计为整体设计进行了探讨。  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号