首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
矿业工程   1篇
  2007年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
With the mine exploitation depth getting deeper and deeper, the mine heat-harm turns into another natural disaster after the five disasters, which are the roof, the gas, the fire, the dust and the flood disaster. Compared with other researches on prevention and cure against the heat-harm, the research on prevention and cure against the heat-harm in constructing mine are less. Referring to the experience of prevention and cure against the heat-harm home and 'abroad, analyzing the characteristic of cooling in the constructing mine, and based on the ground former freezing equipments and the modified mine temporary cooling equipments, the paper proposed four technical projects. By comparing with the four technical projects, the second project is preponderant both in technology and economy and can solve the heat-harm of the constructing mine, which is proved by the forecast and calculation. The project can be widely applied in de-temperature tasks of high temperature and heat-harm mines during the mine constructing period and in the exploiting preparing phase.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号