首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   5篇
  免费   0篇
电工技术   1篇
机械仪表   1篇
原子能技术   3篇
  2015年   1篇
  2011年   2篇
  2009年   1篇
  2008年   1篇
排序方式: 共有5条查询结果,搜索用时 15 毫秒
1
1.
This paper presents an overview of instrumentation and control (I&C) systems of a pressurized water reactor (PWR) type nuclear power plant (NPP) in Korea. Yonggwang unit 3, which was constructed as a basis model for a Korea standard nuclear power plant (KSNP), is selected as an example for the presentation. This overview is derived from analyzing the I&C systems based on a top-down approach. The I&C systems consist of 30 systems. The 183 I&C cabinets are also analyzed and mapped to the systems. The overview is focused on an interface between the systems and the cabinets. This information will be used to understand the implementation of the I&C systems and to group the systems for an upgrade.  相似文献   
2.
A Core Protection Calculator System (CPCS) was developed to initiate a Reactor Trip under the circumstance of certain transients by a Combustion Engineering Company. The major function of the Core Protection Calculator System is to generate contact outputs for the Departure from Nucleate Boiling Ratio (DNBR) Trip and a Local Power Density (LPD) Trip. But in a Core Protection Calculator System, a trip cause cannot be identified, thus only trip signals are transferred to the Plant Protection System (PPS) and only the trip status is displayed. It could take a considerable amount of time and effort for a plant operator to analyze the trip causes of a Core Protection Calculator System. So, a Cause Analysis System for a Core Protection Calculator System (CASCPCS) has been developed by using the rule-base deduction method to assist operators in a Nuclear Power Plant. CASCPCS consists of three major parts. Inference engine has a role of controlling the searching knowledge base, executing the rules and tracking the inference process by using the depth-first searching method. Knowledge base consists of four major parts: rules, data base constants, trip buffer variables and causes. And a user interface is implemented by using menu-driven and window display techniques. The advantage of CASCPCS is that it saves time and effort to diagnose the trip causes of a Core Protection Calculator System, it increases a plant’s availability and reliability, and it makes it easy to manage CASCPCS because of using only a cursor control.  相似文献   
3.
This paper presents the architecture for upgrading the instrumentation and control (I&C) systems of a Korean standard nuclear power plant (KSNP) as an operating nuclear power plant. This paper uses the analysis results of KSNP's I&C systems performed in a previous study. This paper proposes a Preparation–Decision–Design–Assessment (PDDA) process that focuses on quality oriented development, as a cyclical process to develop the architecture. The PDDA was motivated from the practice of architecture-based development used in software engineering fields. In the preparation step of the PDDA, the architecture of digital-based I&C systems was setup for an architectural goal. Single failure criterion and determinism were setup for architectural drivers. In the decision step, defense-in-depth, diversity, redundancy, and independence were determined as architectural tactics to satisfy the single failure criterion, and sequential execution was determined as a tactic to satisfy the determinism. After determining the tactics, the primitive digital-based I&C architecture was determined. In the design step, 17 systems were selected from the KSNP's I&C systems for the upgrade and functionally grouped based on the primitive architecture. The overall architecture was developed to show the deployment of the systems. The detailed architecture of the safety systems was developed by applying a 2-out-of-3 voting logic, and the detailed architecture of the non-safety systems was developed by hot-standby redundancy. While developing the detailed architecture, three ways of signal transmission were determined with proper rationales: hardwire, datalink, and network. In the assessment step, the required network performance, considering the worst-case of data transmission was calculated: the datalink was required by 120 kbps, the safety network by 5 Mbps, and the non-safety network by 60 Mbps. The architecture covered 17 systems out of 22 KSNP's I&C systems. The architecture is implementable with the equipment developed in South Korea. The architecture can be used as a model to upgrade the existing I&C systems in a planned, large-scale, and one-shot manner. A more detailed architecture down to software level will be developed in the future.  相似文献   
4.
5.
循环水余热回收系统中,热泵热网水出口温度在跟踪供热负荷需求时,在受驱动蒸汽量的调节的同时,往往易受热网回水、循环水等工况变化的影响,传统PID控制方式超调量大、负荷跟踪能力差。提出一种混沌变异克隆选择-径向基函数(CPCS-RBF)直接多步预测控制策略,以热泵热网水出口温度预测值与设定值差值为目标函数,利用CPCS优化算法求取目标函数最小时的驱动蒸汽最佳值。预测模型由2个RBF神经网络结合热泵现场运行数据构建,以提高热泵系统适应工况变化的能力;实验结果表明,该控制策略能综合学习热网回水温度、循环水温度等参数的变化,使驱动蒸汽调门超前动作,及时跟踪供热负荷需求变化的同时,适应发电负荷变化下排气余热量的波动,具有更好的节能效果和变工况适应能力。  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号