某水电站导流洞出口边坡稳定性分析与评价
引用本文:陆学华,韩军,张宜虎,成传欢. 某水电站导流洞出口边坡稳定性分析与评价[J]. 长江科学院院报, 2012, 29(10): 90-97. DOI: 10.3969/j.issn.1001-5485.2012.10.018
作者姓名:陆学华  韩军  张宜虎  成传欢
作者单位:1.中国水利水电第十四工程局有限公司,昆明 650041;2.长江科学院 水利部岩土力学与工程重点实验室,武汉 430010
基金项目:973课题(2011CB710603);水利部公益性行业科研专项经费项目(201001008)
摘    要:某水电站现场监测资料表明,电站导流洞出口边坡开挖后有不间断变形,而且速率较大。为查明出口边坡潜在变形破坏范围及特征,对监测资料进行分析,同时采用极限平衡和三维数值模拟手段,对边坡稳定状态进行评价。结果表明:开挖前边坡能够自稳,开挖后如不及时支护,表层第四系土层会发生向开挖面的滑移;侧面边坡变形具有时效性,随时间推移变形破坏范围会向上部逐渐扩展。建议通过补充钻探和物探等措施,详细查明第四系覆盖层分布范围及厚度,同时通过现场试验等手段核实对边坡稳定状态极为敏感的第四系土层和强风化板岩层抗剪强度参数,在此基础上制定可靠的边坡支护措施。

关 键 词:导流洞出口边坡  稳定性  监测  极限平衡分析  三维数值模拟  
收稿时间:2011-11-04
修稿时间:2012-02-28

Stability Analysis and Estimation for Slope at the Diversion Tunnel Outlet of a Hydropower Project
LU Xue-hua , HAN Jun , ZHANG Yi-hu , CHENG Chuan-huan. Stability Analysis and Estimation for Slope at the Diversion Tunnel Outlet of a Hydropower Project[J]. Journal of Yangtze River Scientific Research Institute, 2012, 29(10): 90-97. DOI: 10.3969/j.issn.1001-5485.2012.10.018
Authors:LU Xue-hua    HAN Jun    ZHANG Yi-hu    CHENG Chuan-huan
Affiliation:1. Sinohydro Bureau 14 Co., Ltd., Kunming  650041, China;2.Key Laboratory of Geotechnical Mechanics and Engineering of the MWR, Yangtze River Scientific Research Institute, Wuhan  430010, China
Abstract:In-situ monitoring data of a hydropower station located in southeast China revealed constant and rapid deformation in the slope at the diversion tunnel outlet.To find out the deformation scope and characteristics,the in-situ monitoring data was analyzed in detail,and in association with the limit equilibrium analysis and 3D numerical simulation,the slope stability was evaluated.Research results indicated that the slope was stable before excavation;but without effective support,soil layer in the quaternary system would slide toward the excavation face after excavation.Deformation of the side slope would develop with time,which means that the deformation scope would extend to the upper part gradually in the absence of in-time support.Suggestions were given as follows:before designing the slope support measures,firstly,more drilling or physical inspection work are needed to detect the scope and depth of quaternary soil layer;secondly,in-situ tests are needed to check the shear strength of the easily-slide quaternary soil and strongly weathered slate layers.
Keywords:diversion tunnel outlet slope  stability  monitoring  limit equilibrium analysis  3D numerical simulation