首页 | 本学科首页   官方微博 | 高级检索  
     

黑岱沟露天矿短期计划系统及模型建立
引用本文:宋子岭,魏春启.黑岱沟露天矿短期计划系统及模型建立[J].煤炭学报,1997,22(6):601-605.
作者姓名:宋子岭  魏春启
作者单位:辽宁工程技术大学
摘    要:介绍了准格尔黑岱沟露天矿短期生产计划编制系统及其模型的建立,提出煤矿床地质模型建立过程中的一种考虑各向异性改进的距离幂次反比估值方法,以及图形编辑,计划区算量方法。其估值方法对沉积形成的倾斜矿床及煤层尖灭点估值是有效的,短期生产计划系统模型具有实用性和先进性。

关 键 词:露天矿  短期计划  估值  算量  地质模型  煤矿

HEIDAIGOU OPEN PIT MINE SHORT-PERIOD PRODUCTION PLAN SYSTEM AND MODEL BUILDING
Affiliation:Liaoning Technique University
Abstract:The short-period production plan system for Heidaigou Surface Mine and model building are introduced, in this paper.It's put forward an improved distant power inverse estimating value method considering having different character in every direction in the process of building the coal mine deposit geology model,the graphics edition and the method of calculating volume for plan area. This method is effective to estimate the deposited slanting mine bed and point of thinning out. This short-period production plan system model is practical and advanced.
Keywords:surface mine  short-period plan  estimated value  calculated volume  geology model
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号