首页 | 本学科首页   官方微博 | 高级检索  
     


Linear Scheduling Model with Varying Production Rates
Authors:Gregory A Duffy  Garold D Oberlender  David Hyung Seok Jeong
Affiliation:1Former Doctoral Student; Engineering Supervisor, Chesapeake Midstream Partners, Oklahoma City, OK 73118. E-mail: greg.duffy@chk.com
2Professor Emeritus, School of Civil and Environmental Engineering, Oklahoma State Univ., Stillwater, OK 74074. E-mail: Oberlender@aol.com
3Associate Professor, School of Civil and Environmental Engineering, Oklahoma State Univ., Stillwater, OK 74074 (corresponding author). E-mail: david.jeong@okstate.edu
Abstract:Activity production rates drive the development and accuracy of linear schedules. The nature of linear projects dictates an assortment of variables that affect each activity’s production rate. The purpose of this research was to expand the capabilities of linear scheduling to account for variance in production rates when and where the variance occurs and to enhance the visual capabilities of linear scheduling. This new linear scheduling model, a linear scheduling model with varying production rates (LSMVPR), has two objectives. The first is to outline a framework to apply changes in production rates when and where they occur along the horizontal alignment of the project. The second objective is to illustrate the difficulty or ease of construction through the time-location chart. This research showed that the changes in production rates because of time and location can be modeled for use in predicting future construction projects. Using the concept of working windows, LSMVPR allows the scheduler to develop schedule durations on the basis of minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. The graphical format allows the construction team to visualize the obstacles in the project when and where they occur by using a new feature called the activity performance index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.
Keywords:Project management  Scheduling  Productivity  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号