首页 | 本学科首页   官方微博 | 高级检索  
     

复杂片岩地区桩基工程实践
引用本文:谌伟,彭月英.复杂片岩地区桩基工程实践[J].探矿工程(岩土钻掘工程),2006,33(8):21-23.
作者姓名:谌伟  彭月英
作者单位:中国地质大学<武汉>研究生院,湖北,武汉,430074;河南省地矿局第三地质调查队,河南,信阳,464000
摘    要:复杂片岩地区的桩基工程常出现桩基承载力不足的问题。通过对一典型工程实例的分析,探讨了引起桩基承载力不足的主要原因,及在类似地层桩基施工中应注意的问题。

关 键 词:片岩地区  灌注桩  承载力
文章编号:1672-7428(2006)08-0021-03
收稿时间:2006-05-19
修稿时间:2006-07-13

Pile Foundation Construction in Complex Schist Area
SHEN Wei and PENG Yue-ying.Pile Foundation Construction in Complex Schist Area[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2006,33(8):21-23.
Authors:SHEN Wei and PENG Yue-ying
Affiliation:The 3th Geology Survey Brigade of Henan Geological Survey Bureau;The 3th Geology Survey Brigade of Henan Geological Survey Bureau
Abstract:The shortage of bearing capacity is often encountered in pile foundation construction in complex schist area. The main causes are studied with a typical case, and the problems that should be paid attention to at the similar stratum are also mentioned.
Keywords:schist area  cast-in-place piles  bearing capacity
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《探矿工程(岩土钻掘工程)》浏览原始摘要信息
点击此处可从《探矿工程(岩土钻掘工程)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号