660MW机组脱硫吸收塔设计
引用本文:徐华春.660MW机组脱硫吸收塔设计[J].发电设备,2011(3):219-223.
作者姓名:徐华春
作者单位:中环(中国)工程有限公司,南京210008
摘    要:介绍了大唐南京电厂2台660 MW机组湿法脱硫吸收塔设计方法和步骤。针对该工程无烟气旁路烟道的特点,分析了吸收塔设计需注意的问题和为提高吸收塔可靠性所采取的措施,为同类工程吸收塔设计提供参考。

关 键 词:火电厂  脱硫塔设计  无旁路烟道  防腐措施

Desulfurization Absorber Design for 660 MW Power Units
XU Hua-chun.Desulfurization Absorber Design for 660 MW Power Units[J].Power Equipment,2011(3):219-223.
Authors:XU Hua-chun
Affiliation:XU Hua-chun(GCL Engineering Limited,Nanjing 210008,China)
Abstract:Design method and procedure of wet desulfurization absorbers for 2 660 MW power units in Datang Nanjing Power Plant are being presented.Aiming at the features that the system has no by-pass flue duct,noteworthy items for the design are proposed and countermeasures therefore taken for raising reliability of the absorber put forward.This may serve as a reference for absorber design of similar engineering projects.
Keywords:thermal power plant  design of desulfurization absorber  no by-pass flue duct  anti-corrosion measure