首页 | 本学科首页   官方微博 | 高级检索  
     

水电项目评标决策中的层次分析法
引用本文:李春祥,黄大恒,陈会军. 水电项目评标决策中的层次分析法[J]. 中国水利, 2009, 0(22): 51-53
作者姓名:李春祥  黄大恒  陈会军
作者单位:1. 国电大渡河流域水电开发有限公司,610041,成都
2. 二滩水电开发有限责任公司,610051,成都
摘    要:针对水电项目评标中常用方法存在的问题,将评标看成一个系统,把层次分析这一系统分析方法引用到水电项目评标决策中。层次分析法结构模型中结合专家的经验提出了评标决策的5项准则,通过判断矩阵为每一准则确定了相应权重,量化评标信息,最终为评标决策提供参考依据。

关 键 词:层次分析法  水电项目  评标决策

AHP method in decision making of hydropower project bidding
Li Chunxiang,Huang Daheng,Chen Huijun. AHP method in decision making of hydropower project bidding[J]. China Water Resources, 2009, 0(22): 51-53
Authors:Li Chunxiang  Huang Daheng  Chen Huijun
Affiliation:Li Chunxiangm,Huang Daheng, Chen Huijun
Abstract:Considering the problems existed in the bid evaluation of hydropower project, the method of Analytic Hierarchy Process (AHP) is introduced to the decision making process by regarding bid evaluation as one system. The AHP model offers five criteria for decision making together with experiences of the experts. By means of judgment matrix to determine the weight of each criteria, quantifying bid evaluation information is realized which finally provides a reference for decision making.
Keywords:Analytic Hierarchy Process (AHP)  hydropower project  bid evaluation for decision making
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号