Minimising makespan in the two-stage assembly hybrid flow shop scheduling problem using artificial immune systems
Authors:G.M. Komaki  Ehsan Teymourian  Vahid Kayvanfar
Affiliation:1. Department of Electrical Engineering and Computer Science, Case Western Reserve University, Cleveland, OH, USA;2. Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran;3. Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
Abstract:Two-stage hybrid flow shop (HFS) scheduling problem followed by single assembly machine is addressed in this paper. To produce the final product, parts need to be processed on the HFS stages and thereafter, several parts are joined under the assembly operations based on the predefined Bill of Materials of the product. The aim of this research is to find the schedule which minimises completion time of the last product, i.e. makespan. For the considered problem, lower bound, heuristic algorithms and two metaheuristic techniques based on artificial immune system are developed. Computational results demonstrate that the proposed lower bound and heuristic algorithms outperform the existent lower bounds and heuristic algorithms.
Keywords:hybrid flow shop  assembly operation  makespan  artificial immune system
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号