首页 | 本学科首页   官方微博 | 高级检索  
     


Balancing stochastic two-sided assembly lines
Authors:Wen-Chyuan Chiang  Chunyong Luo
Affiliation:1. Operations Management, The University of Tulsa, Tulsa, OK, USA;2. Spherexx.com, Tulsa, OK, USA
Abstract:In a two-sided assembly line, tasks can be executed simultaneously on both sides of the line. One task cannot be started until both of its direct predecessors on the left and right sides are completed. Therefore, the start time of the task is the maximum of the two predecessors’ finish times. In many realistic situations, it is assumed that the task times are independent and normally distributed with known means and variances. However, the maximum of two normal variables is not normally distributed, but can be well approximated by results from extreme value theory. In this paper, we utilise these results to develop a solution methodology to balance two-sided assembly lines with stochastic task times, minimising the line length and the number of stations while guaranteeing all tasks are completed within the cycle time with a given confidence level.
Keywords:manufacturing  two-sided assembly line  stochastic task time  particle swarm optimization
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号