首页 | 本学科首页   官方微博 | 高级检索  
     

挤压墙施工技术在柏叶口水库的应用
引用本文:张朝辉.挤压墙施工技术在柏叶口水库的应用[J].山西水利科技,2011(3):9-11.
作者姓名:张朝辉
作者单位:山西省柏叶口水库建设管理局,太原,030002
摘    要:柏叶口水库大坝为混凝土面板堆石坝。大坝施工中在垫层料的上游混凝土挤压墙施工技术得到了应用,和传统工艺中的垫层料回填、削坡、斜坡碾压、坡面砂浆碾压等工序相比,简化了施工工序,加快施工进度,提高了施工安全和施工质量,具有保证垫层料的压实质量和提高坡面防护能力以及施工简便等特点。

关 键 词:混凝土面板堆石坝  混凝土挤压墙  施工技术

Application the Technique to Construct Extrusion Wall in Baiyekou Reservoir
ZHANG Chao-hui.Application the Technique to Construct Extrusion Wall in Baiyekou Reservoir[J].Shanxi Hydrotechnics,2011(3):9-11.
Authors:ZHANG Chao-hui
Affiliation:ZHANG Chao-hui
Abstract:The Baiyekou Reservoir's dam is a concrete facing rockfill dam.The technique to construct concrete extrusion wall above the bedding material of upstream dam slope is applied in this dam's construction progress.Compared with the traditional construction working procedure such as backfilling bedding material,scaling,side-slope rolling,rolling mortar in slope surface,this technique simplifies construction procedure,quickens project pace,raises construction security and construction quality.It has many features including ensuring quality to compact bedding material,raising capacity to protect dam slope,and making the construction simple and convenient.
Keywords:concrete facing rockfill dam  concrete extrusion wall  construction technique
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号