首页 | 本学科首页   官方微博 | 高级检索  
     

恒山隧道施工涌水量计算及分析
引用本文:刘军伟.恒山隧道施工涌水量计算及分析[J].山西水利科技,2011(4):24-26.
作者姓名:刘军伟
作者单位:山西省水利水电勘测设计研究院,太原,030024
摘    要:准确预测隧道施工涌水量一直是国内外隧道建设的难点,目前尚无成熟的方法。文中根据恒山隧道沿线的地形和地质条件,对其进行了分段评价,并采用不同方法对隧道施工涌水量进行了计算分析,为隧洞设计及施工提供了地质依据。

关 键 词:隧道  施工涌水量  计算分析

Calculating and Analyzing Hengshan Tunnel's Water Inflow Quantity in Construction Period
LIU Jun-wei.Calculating and Analyzing Hengshan Tunnel's Water Inflow Quantity in Construction Period[J].Shanxi Hydrotechnics,2011(4):24-26.
Authors:LIU Jun-wei
Affiliation:LIU Jun-wei
Abstract:It is a difficult problem continuously at home and abroad to accurately predict tunnel's water inflow quantity in construction period.There is no mature metod up to now.According to the topographical and geological conditions along the line of Hengshan tunnel,the sectionalized geological assessments of tunnel are carried out,and using different methods,the tunnel's water inflow quantitys in construction period are calculated and analyzed.These computed results provide geological basis for engineering design and construction of tunnel.
Keywords:tennel water inflow quantity in construction period calculation anlysis
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号