Kleine Ursache – großer Schaden – Fortsetzung einer komplexen Baumaßnahme im Anschluss an eine Havarie
Authors:Stefan Lü  hr,Karl Morgen
Abstract:Simple cause – extensive damage. Continuation of a complex project in connection with an accident. In September 2008 at the Müritz‐Elde‐channel the new weir Lewitz could be started‐up. The originally planned construction period amounted to 15 months; however, about three years were actually needed. During the production of a temporary bypass in March 2006 an accident occurred. The consequences of the damage had to be eliminated first, before the planned project could be continued. Subsequently, the construction sequences and procedures had to be adapted to the changed boundary conditions. The accident, the removal of the damages and the effects to the building contract are represented in the following.
Keywords:Staustufe  Wehrverschluss  Wasserabfuhr  Umlaufgerinne (Bypass)  Bodeneinbruch  Piping  Spundwand  Durchströ  mung  Wasserwegigkeit  Dichtungen  Injektionen  HDI‐Sä  ulen  Wasserbau  Geotechnik  Strö  mungsmechanik
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号