首页 | 本学科首页   官方微博 | 高级检索  
     

公路桥梁钢箱梁顶推施工技术探讨
引用本文:程惠娟. 公路桥梁钢箱梁顶推施工技术探讨[J]. 山西建筑, 2012, 38(3): 190-191
作者姓名:程惠娟
作者单位:山西运城路桥有限责任公司,山西运城,044000
摘    要:结合工程实例,根据桥梁施工现场的环境情况,给出了钢箱梁顶推法步骤,并对顶推施工时临时设施搭设与布置、梁段顶推、施工监控等程序进行了描述与分析,以指导工程实践,确保公路桥梁建设质量。

关 键 词:公路桥梁  顶推施工  施工监测

Exploration on the steel box girder launching construction technology of the highway bridge
CHENG Hui-juan. Exploration on the steel box girder launching construction technology of the highway bridge[J]. Shanxi Architecture, 2012, 38(3): 190-191
Authors:CHENG Hui-juan
Affiliation:CHENG Hui-juan
Abstract:Integrating with the engineering case,according to the bridge construction field environment condition,the paper shows steel box girder launching procedures,and describes and analyzes temporary facilities setting and layout,beam section launching,and construction monitoring and other procedures,with a view to guide engineering practice and to ensure the highway bridge construction quality.
Keywords:highway bridge  launching construction  construction monitoring
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号