首页 | 本学科首页   官方微博 | 高级检索  
     

HVTC直流线路瞬时接地故障试验的设计与实施
引用本文:王少华,薛辉.HVTC直流线路瞬时接地故障试验的设计与实施[J].江西电力职工大学学报,2010(4):6-7,38.
作者姓名:王少华  薛辉
作者单位:[1]华北电力大学,北京102206 [2]北京供电公司,北京102206
摘    要:阐述了高压直流输电工程直流线路瞬时接地故障试验的设计与实施,从试验目的和原理、试验设备、试验准备、试验操作、安全措施五个方面详细地讲解了如何去设计安排试验。

关 键 词:HVDC  瞬时接地试验  故障试验  试验设计

Design and Implemention of HVTC DC Transient Artificial Ground Fault Test
WANG Shao-hua,XUE Hui.Design and Implemention of HVTC DC Transient Artificial Ground Fault Test[J].Journal of Jiangxi Electrical University For Staff,2010(4):6-7,38.
Authors:WANG Shao-hua  XUE Hui
Affiliation:1.North China Electric Power University Beijing 102206;2.Beijing Power Supply Company Beijing 102206, China)
Abstract:This article focuses on design and implementation of artificial ground fault about DC line transient test in HVDC project.It discusses how to design and implement in five sides: purpose of the experiment, preparation before test, test devices and composition of operation, and system recovery, and security measures.
Keywords:HVDC  transient artificial groundfauh test  fault test  test design
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号