Abstract: | The results of development work on an innovative low-capacity nuclear power plant (LCNPP) Uniterm together with substantiation of the need for a technical design of a reactor system and the basic design of the power plant are presented. The results of the work are used to determine the power range of the power generating unit where the main consumer qualities are guaranteed to be attained. Economic assessments of the development and operation of a two-block LCNPP under conditions in Russia are presented. __________ Translated from Atomnaya énergiya,Vol. 103, No. 1, pp. 44–48, July, 2007. |