首页 | 本学科首页   官方微博 | 高级检索  
     

桥梁高墩施工中的滑模与爬模施工工艺探讨
引用本文:任志刚.桥梁高墩施工中的滑模与爬模施工工艺探讨[J].山西建筑,2014(32):192-193.
作者姓名:任志刚
作者单位:山西路桥第二工程有限公司
摘    要:对桥梁高墩施工中,滑模与爬模两种施工工艺进行了探讨,归纳总结了两种施工工艺的技术要点,并分析了各工艺的优缺点,为桥梁高墩施工的工艺选择提供了参考依据,对桥梁工程的发展具有重要意义。

关 键 词:桥梁  高墩  滑模  爬模  施工

Discussion on the sliding formwork and creeping formwork construction technology in bridge high pier construction
REN Zhi-gang.Discussion on the sliding formwork and creeping formwork construction technology in bridge high pier construction[J].Shanxi Architecture,2014(32):192-193.
Authors:REN Zhi-gang
Affiliation:REN Zhi-gang(Shanxi Road & Bridge Second Engineering Limited Company, Linfen 041000, China )
Abstract:Discussed the sliding formwork and creeping formwork two construction technologies in bridge high pier construction,summarized the technical key points of two kinds of construction technologies,and analyzes the advantages and disadvantages of each technology,provided reference basis for the technology selection of bridge high pier construction,had important meaning to the development of bridge engineering.
Keywords:bridge  high pier  sliding formwork  creeping formwork  construction
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号