铁路T梁钢筋整体绑扎施工技术
引用本文:钟祯荣. 铁路T梁钢筋整体绑扎施工技术[J]. 山西建筑, 2010, 36(24): 161-162
作者姓名:钟祯荣
作者单位:中铁二十二局集团四公司,河北,高碑店,074000
摘    要:结合某制梁场的场地情况,依据铁路T梁钢筋绑扎设计标准,对T梁钢筋整体绑扎台座设计作了探讨,并对其施工工序作了详细介绍,工程实践表明:T梁钢筋整体绑扎工艺具有广阔的应用前景。

关 键 词:铁路T梁  钢筋整体绑扎  台座设计  施工

Construction technology of the overall reinforced banding on railway T-beam
ZHONG Zhen-rong. Construction technology of the overall reinforced banding on railway T-beam[J]. Shanxi Architecture, 2010, 36(24): 161-162
Authors:ZHONG Zhen-rong
Affiliation:ZHONG Zhen-rong
Abstract:With the combination of beam-making site situation, according to railway design standards of T-beam reinforced banding, it discusses the pedestal design of overall T-beam steel banding, and introduces the construction process in detail. Engineering practice shows that overall T-beam steel banding technology has broad application prospects.
Keywords:railway T-beam   overall reinforced banding   pedestal design   construction