大型水轮发电机定子带绕组整体吊装技术应用
引用本文:张建华,戴金芬.大型水轮发电机定子带绕组整体吊装技术应用[J].红水河,2014(2):75-77.
作者姓名:张建华  戴金芬
作者单位:大唐岩滩水力发电有限责任公司
摘    要:岩滩水电站扩建工程共装设2台单机容量为300MW的水轮发电机组,首台机发电总工期计划40月,文章通过定子带绕组整体吊装的变形控制分析和整体吊装对工期的影响,阐述定子带绕组整体吊装的成功应用。

关 键 词:水轮发电机  定子  整体吊装  岩滩水电站扩建工程

Application of Integral Hoisting Technology in Large Hydro- generator Stator and Winding Installation
ZHANG Jian-hua;DAI Jin-fen.Application of Integral Hoisting Technology in Large Hydro- generator Stator and Winding Installation[J].Hongshui River,2014(2):75-77.
Authors:ZHANG Jian-hua;DAI Jin-fen
Affiliation:ZHANG Jian-hua;DAI Jin-fen;Datang Yantan Hydropower Co., Ltd.;
Abstract:The Extension Project of Yantan Hydropower Station is equipped with two hydro-generators with single capacity of 300MW, whose first unit has a total construction period of 40 months. The paper makes an introduction to the successful application of integral hoisting of stator with winding through the analysis on deformation control of in- tegral hoisting and the influence of integral hoisting on the construction period.
Keywords:turbine generator  stator  integral hoisting  Extension Project of Yantan Hydropower Station