首页 | 本学科首页   官方微博 | 高级检索  
     

电耙漏斗分段凿岩阶段矿房嗣后充填法工艺改进的研究
引用本文:吴贤振,饶运章,潘建平. 电耙漏斗分段凿岩阶段矿房嗣后充填法工艺改进的研究[J]. 矿业工程, 2004, 2(4): 16-18
作者姓名:吴贤振  饶运章  潘建平
作者单位:南方冶金学院,江西,赣州,341000;南方冶金学院,江西,赣州,341000;南方冶金学院,江西,赣州,341000
摘    要:根据铜山铜矿矿体赋存状态,改进了电耙漏斗分段凿岩阶段矿房嗣后充填采矿法矿块结构参数,并采用堑沟出矿的底部结构,降低了矿石损失率,提高了矿块生产能力。

关 键 词:结构参数  电耙  堑沟出矿
文章编号:1671-8550(2004)04-0016-02
修稿时间:2004-03-02

The study on the improvement of the technology of sublevel stoping and loading by electric-rake mining method
WU Xian-zhen,RAO Yun-zhang,PAN Jian-ping. The study on the improvement of the technology of sublevel stoping and loading by electric-rake mining method[J]. Mining Engineering, 2004, 2(4): 16-18
Authors:WU Xian-zhen  RAO Yun-zhang  PAN Jian-ping
Abstract:According to the occurrence morphology of orebody in Tongshan copper mine, the structural parameter of sublevel stoping and loading by electric-rake mining method has been improved,and the ore is loaded out by electric-rake from the trench,so the loss of ore declines and the capacity of production increases.
Keywords:structural parameter  electric-rake  trench
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号