某超高层建筑深基坑逆作法施工实例分析
引用本文:朱剑,;唐华岚. 某超高层建筑深基坑逆作法施工实例分析[J]. 广东土木与建筑, 2009, 0(2): 49-52
作者姓名:朱剑,  唐华岚
作者单位:[1]广州市城市建设开发有限公司,广州510620; [2]广州富力地产股份有限公司,广州510640
摘    要:某超高层建筑地下室基坑面积约7086m^2,基坑开挖深度达24.2m~27.4m,采用地下连续墙围护结构加逆作法施工方案,可加快总体施工进度,节省投资,并有效保护周边道路和地下管线,文中介绍逆作法施工过程并分析其重难点,可供参考。

关 键 词:逆作法  支护结构  深基坑

Analysis of up-down Construction Method for Deep Excavation Engineerings
Affiliation:Zhu Jian, Hualan Tang (1.Guangzhou city construction & development Co.Ltd Guangzhou 510620,China; 2.Guangzhou R&F Properties Co.Ltd Guangzhou 510640,China)
Abstract:The engineering example of this paper is based with a deep excavation with excavation depth of 24.2m-27.4m and area of 7086m^2. It is excavated with use of the supporting structure of diaphragm wall and up-down construction method Through use of this construction technology,it speed up the project,reduced the investment outlay and ensured the safety of surrounding road and underground utilities effectively. The paper introduces the overall process of up-down construction and presents the focal points and difficulties during construction.
Keywords:up-down construction method  supporting structure  deep excavation engineering