首页 | 本学科首页   官方微博 | 高级检索  
     

广州亚运城综合管沟深基坑施工的应用与实践
引用本文:杨小荣.广州亚运城综合管沟深基坑施工的应用与实践[J].广东土木与建筑,2009(2):60-61.
作者姓名:杨小荣
作者单位:广州市重点公共建设项目管理办公室,广州510665
摘    要:广州亚运城位于广州市番禺区,规划总用地面积约2.74km^2,其市政道路建设项目的综合管沟属于大型地下设施,施工中涉及到地质条件较差的深基坑支护问题.笔者在项目施工管理中总结了相关经验,可供同类工程参考。

关 键 词:综合管沟  深基坑支护  施工管理  施工技术

The Application and Practice of Deep Foundation Ditch Construction for Integrated Pipelines in Guangzhou Asian Games Town
Yang Xiaorong.The Application and Practice of Deep Foundation Ditch Construction for Integrated Pipelines in Guangzhou Asian Games Town[J].Guangdong Architecture Civil Engineering,2009(2):60-61.
Authors:Yang Xiaorong
Affiliation:Yang Xiaorong (Guangzhou Administraration Office of Major Pubic Construction Projects Guangzhou 510665,China)
Abstract:Guangzhou Asian Games Town is located in Panyu District in Guangzhou with the total land area of about 2.74km^2. Integrated pipelines,as large-scale underground facilities,are part of the municipal road construction project of Asian Games Town. Its construction will include the deep foundation ditch shoring under worse geological condition. The author summarizes beneficial experience in this part through solving some problems during its construction and project management.
Keywords:Integrated pipelines  foundation ditch
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号