首页 | 本学科首页   官方微博 | 高级检索  
     

团结水电站压力钢岔管设计
引用本文:赵炜,漆文邦,何芳.团结水电站压力钢岔管设计[J].西北水电,2012(1):18-21.
作者姓名:赵炜  漆文邦  何芳
作者单位:四川大学水利水电学院,四川成都,610065
摘    要:水电站发电引水系统中,压力钢管的岔管结构复杂,类型多样,其中内加强月牙肋岔管应用最为广泛。通过对团结水电站压力钢岔管的设计计算,对内加强月牙肋岔管的结构设计提出了较为完整的方法与探讨。

关 键 词:内加强月牙肋  岔管  体型选择  设计  结构计算

Design of Bifurcated Penstock, Tuanjie Hydropower Project
ZHAO Wei , QI Wen-bang , HE Fang.Design of Bifurcated Penstock, Tuanjie Hydropower Project[J].Northwest Water Power,2012(1):18-21.
Authors:ZHAO Wei  QI Wen-bang  HE Fang
Affiliation:(College of Water Resources and Hydropower, Sichuan University, Chengdu 610065, China)
Abstract:in the headrace system of a hydropower station, the bifurcated penstock is complicated in structure and varied in structural types. Among these structures, the bifurcated penstock with crescent rib stiffened inside is widely applied. Through calculation on design of the bifurcated penstock of Tuanjie Hydropower Project, a quite complete method for the structural design of the bifurcated penstock with crescent rib stiffened inside is raised and discussed accordingly.
Keywords:crescent rib stiffened inside  bifurcated penstock  outline selection  design  structural calculation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号