首页 | 本学科首页   官方微博 | 高级检索  
     

强震区断裂活动与大型滑坡关系研究
引用本文:张永双,苏生瑞,吴树仁,石菊松,孙 萍,姚 鑫,熊探宇. 强震区断裂活动与大型滑坡关系研究[J]. 岩石力学与工程学报, 2011, 30(Z2): 3503-3513
作者姓名:张永双  苏生瑞  吴树仁  石菊松  孙 萍  姚 鑫  熊探宇
作者单位:(1. 国土资源部 新构造运动与地质灾害重点实验室,北京 100081;2. 中国地质科学院 地质力学研究所,北京 100081;;3. 长安大学 地质工程与测绘学院,陕西 西安 710054)
摘    要: 活动断裂带与大型滑坡之间的关系一直是人们关注的热点问题。通过汶川Ms8.0级地震活动断裂和大型滑坡调查,阐述龙门山活动断裂带大型滑坡形成的地质背景,总结活动断裂带大型地震滑坡的分布特征、形态特征、启动特征和分段特征及其相关影响因素。基于野外调查资料,以龙门山中央断裂带谢家店子滑坡为例,采用离散元方法模拟分析滑坡的启动和快速运移过程,提出高速远程滑坡的致灾后果决定于启动方式、飞行路径和堆积特征3个方面。本项研究对于认识断裂活动与大型滑坡之间的关系以及滑坡成灾后果预测具有重要的指导作用。

关 键 词:地震工程汶川地震地震滑坡活动断裂数值模拟离散元法
收稿时间:2010-08-24;

RESEARCH ON RELATIONSHIP BETWEEN FAULT MOVEMENT AND LARGE-SCALE LANDSLIDE IN INTENSIVE EARTHQUAKE REGION
ZHANG Yongshuang,,SU Shengrui,WU Shuren,,SHI Jusong,,SUN Ping,,YAO Xin,,XIONG Tanyu,. RESEARCH ON RELATIONSHIP BETWEEN FAULT MOVEMENT AND LARGE-SCALE LANDSLIDE IN INTENSIVE EARTHQUAKE REGION[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(Z2): 3503-3513
Authors:ZHANG Yongshuang    SU Shengrui  WU Shuren    SHI Jusong    SUN Ping    YAO Xin    XIONG Tanyu  
Affiliation:(1. Key Laboratory of Neotectonic Movement and Geohazard,Ministry of Land and Resources,Beijing 100081,China;2. Institute of Geomechanics,Chinese Academy of Geological Sciences,Beijing 100081,China;3. School of Geological Engineering and Surveying, Chang?an University,Xi?an,Shaanxi 710054,China)
Abstract:The relationship between active fault zone and large-scale landslides is a major issue on which people always concern. Based on field investigation of active fault zones and large-scale landslides induced by Wenchuan Ms 8.0 earthquake,the geological setting for large-scale landslides initiation in the Longmenshan active fault zones is documented,and the characteristics of distribution,shape,initiation and segmentation,as well as their influential factors,are summarized. Taking the Xiejiadianzi landslide-debris flow near the central Longmenshan fault zone as an example,simulations of the processes of landslide starting and fast slipping have been carried out by the discrete element method(DEM). It is thought that the disaster result of a rapid and long run-out landslide are dominated by the starting style,debris flying route and dumpling features. This research provides important information for the realization of the relationship between the fault movement and the formation of large-scale landslides,as well as prediction of the disaster result caused by earthquake landslides.
Keywords:earthquake engineering  Wenchuan earthquake  earthquake induced landslide  active fault  numerical simulation  discrete element method(DEM)
点击此处可从《岩石力学与工程学报》浏览原始摘要信息
点击此处可从《岩石力学与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号