首页 | 本学科首页   官方微博 | 高级检索  
     

计及新能源消纳的多级调度计划协调决策方法
引用本文:张国芳,杨小磊,孙永超. 计及新能源消纳的多级调度计划协调决策方法[J]. 四川电力技术, 2021, 44(6): 32-37
作者姓名:张国芳  杨小磊  孙永超
作者单位:国网四川省电力公司;国网四川省电力公司成都供电公司;国网四川省电力公司电力科学研究院
基金项目:国网公司科技项目1300-202026033A-0-0-000
摘    要:构建以新能源为主体的新型电力系统是碳中和、碳达峰的重要举措。针对新能源具有的独特特性与成本模式,在当前中国大电网多级调度计划协调编制模式中,为避免国分调在编制跨区跨省联络线计划时基于电力交易而较少考虑省网约束,可能导致的省网计划无法收敛而需要反复流转修改,文中设计了一种“自下而上”的多级调度计划编制方案。考虑新能源消纳情况,将联络线计划作为可调的决策变量,同时考虑运行约束,建立省网外送或受入的极限能力分析模型,求解获得联络线计划的边界条件。最终得到国分调据此边界条件编制满足省网约束的联络线计划。并以实际电网算例对所提方法的有效性进行了验证。

关 键 词:新能源消纳  联络线计划  调度计划  经济调度

Coordination Decision Method of Multilevel Dispatching Plan Considering Renewable Energy Accommodation
Zhang Guofang,Yang Xiaolei,Sun Yongchao. Coordination Decision Method of Multilevel Dispatching Plan Considering Renewable Energy Accommodation[J]. Sichuan Electric Power Technology, 2021, 44(6): 32-37
Authors:Zhang Guofang  Yang Xiaolei  Sun Yongchao
Affiliation:State Grid Sichuan Electric Power Company;State Grid Chengdu Electric Power Supply Company; State Grid Sichuan Electric Power Research Institute
Abstract:Building a new power system with renewable energy as the main body is an important measure for carbon neutralization and carbon peaking. Aiming at the unique characteristics and cost model of renewable energy, in the current multi-level dispatching plan coordination mode of large power grid in China, a bottom-up multi level dispatching plan preparation schemeis designed in order to avoid the lack of consideration of provincial grid constraints based on power transactions in the preparation of cross regional and cross provincial tie-line plans, which may lead to the convergence of provincial grid plans and require repeated circulation and modification. Considering the renewable energy accommodation, the tieline plan is taken as an adjustable decision variable, and considering the operation constraints, the limit capacity analysis model of provincial network transmission or acceptance is established to solve the boundary conditions of the tieline plan. Finally,according to the boundary conditions, the tie-line plan meeting the provincial network constraints is compiled. The effectiveness of the proposed method is verified by an actual power grid example.
Keywords:renewable energy accommodation   tie-line plan   dispatching plan   economic dispatch
本文献已被 维普 等数据库收录!
点击此处可从《四川电力技术》浏览原始摘要信息
点击此处可从《四川电力技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号