长甸电站进水口洞脸护固工程风化岩锚喷工艺试验
引用本文:秦卫星,侯勇,吴立波. 长甸电站进水口洞脸护固工程风化岩锚喷工艺试验[J]. 黑龙江水专学报, 2002, 29(1): 113-114
作者姓名:秦卫星  侯勇  吴立波
作者单位:1. 中国水利水电第六工程局,辽宁,丹东,118216
2. 黑龙江省桃山水库管理处,七台河,154600
摘    要:根据设计要求,需在进水口洞脸风化岩部位做锚喷施工,采用干喷设备进行湿喷混凝土试验,结果达到了设计要求及预期的目的.

关 键 词:干喷  湿喷  混凝土
文章编号:1000-9833(2002)01-0113-02
修稿时间:2001-10-15

Weathering rock anchor-spray experiment of tunnel take opening surface engineering in Changdian Electric Station
Weathering rock anchor-spray experiment of tunnel take opening surface engineering in Changdian Electric Station. Weathering rock anchor-spray experiment of tunnel take opening surface engineering in Changdian Electric Station[J]. Journal of Heilongjiang Hydraulic Engineering College, 2002, 29(1): 113-114
Authors:Weathering rock anchor-spray experiment of tunnel take opening surface engineering in Changdian Electric Station
Abstract:According to the design demand ,anchor_spraying construction should be used in the part of intake opening surface of weathering rock.This paper introduces how to adopt dry_spraying equipment to carry on wet_spraying experiment to reach the design demand and aim of expectant.
Keywords:dry spraying  wet spraying  concrete