厚煤层无煤柱自成巷110工法技术的应用实践
作者姓名:葛晓伟
作者单位:山西省煤炭建设监理有限公司
摘    要:以山西阳城小西煤矿1305工作面为例,对厚煤层无煤柱自成巷110工法技术的实践应用进行研究。通过对无煤柱自成巷110工法方案的分析,确定留巷段巷内、巷旁支护参数。经过实际应用,发现该技术应用效果理想。该技术的应用减少了掘进工程量,节约了煤炭资源,提高了资源利用率,为企业创造了较好的经济效益。

关 键 词:厚煤层  无煤柱  自成巷  110工法

Application Practice of 110 Construction Method Technology of Self-contained Roadway without Coal Pillars in Thick Coal Seam
Authors:GE Xiaowei
Affiliation:(Shanxi Coal Construction Management Co.,Ltd.,Taiyuan 030012,Shanxi,China)
Abstract:Taking the 1305 working face of Xiaoxi Coal Mine in Yangcheng,Shanxi as an example,the practical application of 110 construction method technology of self-contained roadway without coal pillars in thick coal seam was studied.Through the analysis of the 110 construction method scheme of the self-contained roadway without coal pillars,this paper determined the support parameters of the roadway in and next to the remaining roadway section.After practical application,it is found that the application effect of this technology was ideal.The application of this technology reduced the amount of excavation engineering,saved coal resources,improved resource utilization,and created better economic benefits for enterprises.
Keywords:thick coal seam  without coal pillars  self-contained roadway  110 construction method