首页 | 本学科首页   官方微博 | 高级检索  
     

贵州鸭溪电厂锅炉汽包差压式水位计改造
引用本文:万荣,何华靖,王翔.贵州鸭溪电厂锅炉汽包差压式水位计改造[J].贵州电力技术,2010(7):13-15.
作者姓名:万荣  何华靖  王翔
作者单位:贵州鸭溪金元发电运营有限公司,贵州贵阳563108
摘    要:针对锅炉汽包差压水位的测量原理,分析在汽包水位测量中存在的问题,根据影响汽包水位测量不准的主要原因环境温度、汽包压力等,提出改变原单室平衡容器的正、负压侧取样筒的开口形状和将与正、负压侧连接的取样管水平延长的改造方案。

关 键 词:汽包  水位  改造

Improvement of drum differential pressure water level gauge in Guizhou yaxi power plant
Wan Rong,He Huajing,WangXiang.Improvement of drum differential pressure water level gauge in Guizhou yaxi power plant[J].Guizhou Electric Power Technology,2010(7):13-15.
Authors:Wan Rong  He Huajing  WangXiang
Affiliation:( Yaxi Electric Power Plant, Zunyi 563108 Guizhou, China)
Abstract:According to the measuring principle of differential pressure water level gauge, this paper ana- lyses the problems of drum level measurement. And according to the main factors which affect the accura- cy of drum level measurement, such as ambient temperature and steam drum pressure etc, this paper pro- poses a reform scheme that changing the opening shape of sampling container in original signal cell equi- librium vessel and extending the sampling tube which connects the positive and negative pressure.
Keywords:steam drum  water level  improvement
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号