首页 | 本学科首页   官方微博 | 高级检索  
     


Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control
Authors:Helen Lingard  Payam Pirzadeh  Nick Blismas  Ron Wakefield  Brian Kleiner
Affiliation:1. School of Property, Construction and Project Management, RMIT University, GPO Box 2476, Melbourne, 3001 Australiahelen.lingard@rmit.edu.au;3. School of Property, Construction and Project Management, RMIT University, GPO Box 2476, Melbourne, 3001 Australia;4. Myers-Lawson School of Construction, Virginia Polytechnic Institute and State University, Blacksburg, VA, USA
Abstract:The position of the constructor in communication networks, including those before the commencement of construction, is likely related to the quality of work health and safety (WHS) outcomes realized. In order to examine the extent of this relationship, 23 cases were drawn from 10 participating construction projects in Australia and New Zealand. Social network analysis was used to mathematically and graphically model information exchanges in 13 of these cases. For each case, the quality of WHS risk control outcomes was measured. This measurement was based on an established ‘hierarchy of control’ in which risk controls are classified in descending order of effectiveness from the elimination of a hazard (the most effective) to the reliance on personal protective equipment (the least effective). Social network metrics were calculated reflecting: (1) the ratio of actual links among parties in the project network relative to the maximum number of links possible (network density); and (2) the extent to which the constructor communicated with other parties in pre-project planning and design stages (the constructors’ degree centrality). Network metrics were compared for cases in which the risk control scores were higher and lower than average. The results showed a significant difference in constructors’ pre-construction degree centrality for cases with high and low risk control scores. The results provide preliminary evidence as to the potential WHS benefits of ensuring that constructors’ knowledge about construction methods, materials, WHS risks and means of risk control, are integrated into pre-construction decision-making.
Keywords:Construction planning and design  constructor involvement  health and safety  risk control.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号