Deterministic models for assessing productivity and cost of bored piles
Authors:Tarek M Zayed Corresponding author  Daniel W Halpin
Affiliation:1. Assistant Professor, Construction Engineering and Management Department, faculty of Engineering, Zagazig University, Zagazig, Egypt;2. Presently Assistant Professor Department of Building, Civil and Environmental Engineering , Concordia University , 1257 Guy Street, BE Building, Room 8779, Montreal, QC , H3G 1M7 , Canada;3. Head of Division of Construction Engineering and Management, School of Civil Engineering , Purdue University , West Lafayette , IN 47907‐1294 , USA
Abstract:The assessment process of productivity and cost of bored pile construction is dictated by unseen subsurface obstacles, lack of contractor experience and site planning. These problems complicate the estimator's role in evaluating pile equipment productivity and cost. Current research discusses the assessment of piling process productivity and cost using the deterministic technique. Data are collected through questionnaires, site interviews and telephone calls to experts in various construction companies. Many variables have been considered in the piling construction process, such as pile size, depth, pouring method, soil type and construction method. Five deterministic models have been designated to assess productivity, cycle time and cost. The developed models are validated whereas 79% of the outputs have been predicted with more than 75% accuracy. Consequently, three sets of charts have been developed to provide the decision‐maker with a solid planning, scheduling and control tool for piling projects. If a pile has 60′ depth with φ‐18 (18″ diameter pile) in clay soil using a 5′ auger height, the cycle time is estimated as 56 and 65.5 minutes; however, productivity is 6 and 5 holes/day for dry and wet methods, respectively.
Keywords:Bored pile  cost  cycle time  deterministic models  productivity
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号