首页 | 本学科首页   官方微博 | 高级检索  
     

利用全回转设备清除钻孔灌注桩
引用本文:秦军. 利用全回转设备清除钻孔灌注桩[J]. 中国市政工程, 2009, 0(6): 60-61
作者姓名:秦军
作者单位:上海隧道工程股份有限公司,上海,200082
摘    要:某地下车站工程施工时,遇到原有建筑的桩基础需拔除,采用全回转设备清除地下障碍物具有对地下原状土破坏小、基本不扰动地下土体的优点。介绍了RT260H全回转设备的技术参数、施工流程、钢套管钻进注意事项、拔桩要点、回填施工等施工工艺。

关 键 词:全回转设备  钻孔灌注桩  清障施工

On Clearing Bored Piles by Use of Full-rotating Equipment
QING Jun. On Clearing Bored Piles by Use of Full-rotating Equipment[J]. China Municipal Engineering, 2009, 0(6): 60-61
Authors:QING Jun
Abstract:With a project case of underground station, the pile foundations of existing buildings should be removed. It is of some advantages to use full-rotating equipment to clear underground obstacles such as little destructive effect for undisturbed soil and no disturbing the underground soil body. Then, several technical parameters and construction technologies about full-rotating equipment RT260H are presented including the procedure, steel thimbles drilling, removing the piles and backfilling, etc.
Keywords:full-rotating equipment   bored pile   obstacle clearing construction
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号