浅议某核电厂排水点的优化
引用本文:陈锋,侯树强.浅议某核电厂排水点的优化[J].核安全,2011(1):48-52.
作者姓名:陈锋  侯树强
作者单位:中国核电工程有限公司,北京,100840
摘    要:主要从某核电厂温排水影响范围、排水工程总投资(包括用海费用、养殖补偿费用、工程造价等)、排水设施(如排水明渠、盾构或暗渠等)长度以及排水点所在海域的水深等几个方面阐述了该核电厂排水方案排水点的优化过程,并对这几个主要因素进行了简单的分析。

关 键 词:核电厂  排水点  明渠

The Optimization of the Drainage Point for the Nuclear Power Plant
CHEN Feng,HOU Shuqiang.The Optimization of the Drainage Point for the Nuclear Power Plant[J].Nuclear Safety,2011(1):48-52.
Authors:CHEN Feng  HOU Shuqiang
Affiliation:(China Nuclear Power Engineering Co.,Ltd,Beijing 100840,China)
Abstract:In this paper,the optimization process of a drainage point for a coastal nuclear power plant in China is expatiated in the following aspects:the affected area of warm water discharge;the total investment of the drainage project(including the cost for the confiscation of sea area,the compensation for the culturists,the project cost,etc.);the length of drainage facilities(such as open channels,culverts or shields,etc.);the depth of the seawater where the drainage is installed.Brief analysis is also made from these main factors.
Keywords:nuclear power plant  drainage point  open channels