首页 | 本学科首页   官方微博 | 高级检索  
     

尾水重叠变化条件下水电站装机容量选择
引用本文:徐敏. 尾水重叠变化条件下水电站装机容量选择[J]. 水利水电技术, 2013, 44(8): 81
作者姓名:徐敏
作者单位:(中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550081)
摘    要:董箐水电站的下游与龙滩水库衔接,呈现远景尾水重叠变化的特点。通过分析董箐水电站近远期水头特性、上游光照水库对董箐水电站入库径流的影响、河段综合利用要求、供电范围内负荷特性、电源结构及电力市场需求等,采取近期和远景结合的思路,以梯级发电引用流量匹配为原则,通过多方案技术经济比较,选择董箐水电站装机容量为880 MW。

关 键 词:尾水重叠变化  水电站  装机容量选择  董箐水电站  
收稿时间:2013-05-14

Selection of installed capacity for hydropower station under condition of overlapped change of tail-water
XU Min. Selection of installed capacity for hydropower station under condition of overlapped change of tail-water[J]. Water Resources and Hydropower Engineering, 2013, 44(8): 81
Authors:XU Min
Affiliation:(Hydrochina Guiyang Engineering Corporation, Guiyang550081, Guizhou,China)
Abstract:As the downstream of Dongqing Hydropower Station links up with Longtan Reservoir, a feature of an overlapped change of the tail-water in the future is presented. Through the analysis on the recent and future characteristics of the water head, the impact from the upstream Guangzhao Reservoir on the inflow runoff to Dongqing Hydropower Station, the requirement on the comprehensive utilization of the river reach, the loading characteristics within the power supply range, the structure of power supply, demand of power market, etc., the concept of the combination of both the recent and the future is adopted, and then the installed capacity of 880 MW is selected for Dongqing Hydropower Station by taking the matching of the diversion water rate for the cascade power generation as the principle through the technical and economic comparison made among several schemes concerned.
Keywords:overlapped change of tail-water  hydropower station  selection of installed capacity  Dongqing Hydropower Station
本文献已被 万方数据 等数据库收录!
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号