首页 | 本学科首页   官方微博 | 高级检索  
     

乌江沙沱水电站下闸蓄水与梯级协作调度
引用本文:范国福. 乌江沙沱水电站下闸蓄水与梯级协作调度[J]. 水利水电技术, 2013, 44(8): 89
作者姓名:范国福
作者单位:(中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550081)
摘    要:乌江是我国水电梯级开发最好的水电基地之一,沙沱水电站为乌江干流最后一个投入运行的大型水电站。本文通过分析沙沱水电站工程特点、上下游水库条件等,总结了沙沱水电站下闸蓄水的梯级协作调度方案,该方案也将在沙沱水电站实际下闸蓄水阶段具体实施

关 键 词:乌江  沙沱水电站  下闸蓄水  梯级协作调度  
收稿时间:2013-05-02

Impoundment and cascade joint-operation of Shatuo Hydropower Station on Wujiang River
FAN Guofu. Impoundment and cascade joint-operation of Shatuo Hydropower Station on Wujiang River[J]. Water Resources and Hydropower Engineering, 2013, 44(8): 89
Authors:FAN Guofu
Affiliation:(Hydrochina Guiyang Engineering Corporation, Guiyang550081, Guizhou, China)
Abstract:Wujiang River is one of the best bases for the cascade development of hydropower; on which Shatuo Hydropower Station is the large hydropower station that puts into operation lastly. Through the analysis on the characteristics, the conditions of both the upstream and downstream reservoirs, etc., the cascade joint-operation scheme for the impoundment of the hydropower station are summarized herein, and this scheme is to be implemented for the actual impoundment concerned.
Keywords:Wujiang River  Shatuo Hydropower Station  impoundment  cascade joint-operation
本文献已被 万方数据 等数据库收录!
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号