首页 | 本学科首页   官方微博 | 高级检索  
     

某大型地下硐室群稳定性分析及加固技术研究
引用本文:肖益盖,刘允秋,汪为平,王雨波,夏才初,徐晨,吕志涛,林梓梁. 某大型地下硐室群稳定性分析及加固技术研究[J]. 金属矿山, 2020, 49(9): 96-103
作者姓名:肖益盖  刘允秋  汪为平  王雨波  夏才初  徐晨  吕志涛  林梓梁
作者单位:1. 中南大学资源与安全工程学院,湖南 长沙 410083;2. 中钢集团马鞍山矿山研究总院股份有限公司,安徽 马鞍山 243000;3. 同济大学土木工程学院,上海 200092
摘    要:某大型地下硐室群作为历史文物存续时间一般有数百年甚至千年,其安全等级不同于一般岩体工程,在各种因素影响下,大型硐室群岩体结构稳定性减弱,强度降低,最终导致岩体失稳、损坏,因此对其进行岩体稳定性分析和加固十分必要。该大型地下硐室群建设工程属于大型地下岩体开挖工程,岩体工程开挖前,通过工程地质调查显示,硐室群岩体整体稳定性较好,通过稳定性经验评价法对其进行了稳定性分析,发现硐室群整体稳定性好。在此基础上,采用三维数值仿真模拟计算方法对硐室群整体稳定性进行了评价,计算结果与工程地质调查、稳定性经验评价法的判断结果基本吻合,大型硐室群开挖后围岩总体上处于稳定状态。针对硐室内局部有断层破碎带和局部块体存在失稳隐患,提出了以“锚杆与注浆、浇筑混凝土相结合”的锚网喷为主的加固方案,有有效确保了其安全稳定。

关 键 词:地下硐室群  节理裂隙  岩体稳定性分析  数值模拟  注浆加固  

Study on the Stability analysis and Reinforcement Technique of a Large Underground Chamber Group
XIAO Yigai,LIU Yunqiu,WANG Weiping,WANG Yubo,XIA Caichu,XU Chen,Lü Zhitao,LIN Ziliang. Study on the Stability analysis and Reinforcement Technique of a Large Underground Chamber Group[J]. Metal Mine, 2020, 49(9): 96-103
Authors:XIAO Yigai  LIU Yunqiu  WANG Weiping  WANG Yubo  XIA Caichu  XU Chen  Lü Zhitao  LIN Ziliang
Affiliation:1. School of Resources and Safety Engineering,Central South University, Changsha 410083,China;2. Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.,Maanshan 243000, China;3. College of Civil Engineering,Tongji University,Shanghai 200092,China
Abstract:A large underground cavern group as historical relics generally lasts for hundreds of years or even thousands of years,which level of security is different from general rock mass engineering,under the influence of various factors,large cavern group of rock mass structural stability and strength are reduced,eventually lead to the instability of rock mass,damage,therefore,it is necessary to conduct stability analysis of rock mass and reinforce technique study of the large underground chamber group.The large underground chamber group construction project belongs to the large underground rock mass excavation project.Before the excavation of the rock mass project,the engineering geological survey results show that the overall stability of the rock mass of the chamber group is good,and the stability analysis is carried out by the stability empirical evaluation method,it is found that the overall stability of the chamber group is good.Based on the above discussion results,the three-dimensional numerical simulation method is used to evaluate the overall stability of the chamber group.The calculation results are basically consistent with those of the engineering geological survey and the stability empirical evaluation method.The surrounding rock of the large chamber group after excavation is generally in a stable state.In view of the local fault fracture zone and the instability hidden danger of the local block in the adit,the reinforcement scheme of anchor net spraying,which is based on the combination of anchor bolt, grouting and pouring concrete is proposed,it is help for effectively ensuring its safety and stability.
Keywords:
本文献已被 万方数据 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号