龙滩水电站PSS试验与应用
引用本文:黄贵华,尹熬,雷晓光,戴文.龙滩水电站PSS试验与应用[J].红水河,2011,30(3):37-41.
作者姓名:黄贵华  尹熬  雷晓光  戴文
作者单位:1. 龙滩水力发电厂,广西天峨,547300
2. 浙江省仙居供电局,浙江仙居,317300
摘    要:通过对龙滩水电站7号机组的PSS现场试验和参数选择,确定了PSS的运行参数,检验了PSS性能,为实际应用提供了理论依据.为了消除安全臆患,根据7号机组运行情况,对7号机组PSS进行技改,提高了机组运行可靠性.

关 键 词:PSS  试验  技改  可靠性  龙滩水电站

Test and Application of PSS at Longtan Hydropower Station
HUANG Gui-hua,YIN Ao,LEI Xiao-guang,DAI Wen.Test and Application of PSS at Longtan Hydropower Station[J].Hongshui River,2011,30(3):37-41.
Authors:HUANG Gui-hua  YIN Ao  LEI Xiao-guang  DAI Wen
Affiliation:HUANG Gui-hua1,YIN Ao1,LEI Xiao-guang1,DAI Wen2(1.Longtan Hydropower Plant,Tian'e 547300,2.Zhejiang Xianju Power Supply Bureau,Xianju 317300)
Abstract:Through site test and parameter selection for PSS of 7# unit of Longtan Hydropower Station,operating parameters of PSS are determined and its performance is tested,providing theoretical basis for its practical use.In order to eliminate potential safety problems,technical innovation is made for PSS of 7# unit based on the operation of the unit,and the unit works more reliably.
Keywords:PSS  test  technical innovation  reliability  Longtan Hydropower Station  