柬埔寨斯登沃代水电站电气一次设计
引用本文:闭文娟,黄玉琼. 柬埔寨斯登沃代水电站电气一次设计[J]. 红水河, 2011, 30(3): 1-4,9
作者姓名:闭文娟  黄玉琼
作者单位:广西电力工业勘察设计研究院,广西南宁,530023
摘    要:介绍柬埔寨斯登沃代水电站工程在电气主接线、主要设备选择、400V厂用电接线、电气设备布置等方面的设计特点,主要包括发电机断路器的配置、主变压器及厂用变压器的选择、115kV GIS开关站的布置等.可供水电工程电气设计同行参考.

关 键 词:电气主接线  厂用电  柬埔寨斯登沃代水电站

Electrical Primary Design for Stung Atay Hydropower Project in Cambodia
BI Wen-juan,HUANG Yu-qiong. Electrical Primary Design for Stung Atay Hydropower Project in Cambodia[J]. Hongshui River, 2011, 30(3): 1-4,9
Authors:BI Wen-juan  HUANG Yu-qiong
Affiliation:BI Wen-juan,HUANG Yu-qiong(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Abstract:The article introduces designs made for Stung Atay Hydropower Project in Cambodia in terms of main electric connection,main electric equipment selection,400V station electrical wiring,and arrangement of electrical equipment,mainly involving the design of generator circuit breaker,selection of main transformer and station service transformer,and layout of 115kV GIS switchyard.
Keywords:main electric connection  station service power  Stung Atay Hydropower Project in Cambodia  