首页 | 本学科首页   官方微博 | 高级检索  
     

广州珠江黄埔大桥承台大体积混凝土温控技术
引用本文:涂雪松,刘家彬. 广州珠江黄埔大桥承台大体积混凝土温控技术[J]. 江苏建材, 2007, 0(1): 52-54
作者姓名:涂雪松  刘家彬
作者单位:东南大学土木工程学院,江苏,南京,210000;东南大学土木工程学院,江苏,南京,210000
摘    要:介绍广州珠江黄埔大桥承台大体积混凝土施工温控的施工方案决策、计算结果及施工过程控制计算,并对温度监测结果进行了分析.

关 键 词:承台  大体积混凝土  水化热  温度控制
收稿时间:2007-02-06

On temperature control of massive concrete pile cap in Huangpu Bridge
Tu Xuesong,Liu Jiabin. On temperature control of massive concrete pile cap in Huangpu Bridge[J]. , 2007, 0(1): 52-54
Authors:Tu Xuesong  Liu Jiabin
Affiliation:Tu Xuesong Liu Jiabin
Abstract:This paper presents in considerable details the calculation results for finalizing the construction scheme of temperature control and calculations for the construction process control of the massive concrete for pile caps of Bridge in Guangzhou , and analyses the results of the calculations to those of the temperature monitoring.
Keywords:pile cap    massive concrete    cement hydration heat    temperature control Huangpu
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号