两台300MWe机组发电厂6kV厂用电源系统互为备用改造方案及实施
引用本文:王展飞,赵向阳,王巍.两台300MWe机组发电厂6kV厂用电源系统互为备用改造方案及实施[J].电力技术,2010(8).
作者姓名:王展飞  赵向阳  王巍
作者单位:大唐户县第二发电厂
摘    要:从经济原因考虑,目前典型设计两台机组的电厂,多只设计一台启备变供给两台机组启备厂用电源。当该电源因故障或检修等原因无法保证时,两台机组均将失去启备电源,对于机组的安全运行将带来影响;同时,机组停机后将无法再启动,失去发电能力。本方案在保持原6 kV厂用电源系统结构的情况下,使两台机组能互相提供厂用电源,从而克服上述设计缺陷,增加了厂用电源供给的可靠性。

关 键 词:厂用电  备用电源  互为备用  快切

Reformation Scheme and Implement for 6kV Auxiliary Power Supply Systems of Two 300MWe Units Being Spare Mutually
Authors:WANG Zhan-fei  ZHAO Xiang-yang  WANG Wei
Abstract:Due to the economical consideration,in the current typical design of power plant with two units,only one start and stand-by auxiliary transformer was mostly designed for the two units as start and stand-by auxiliary power supply.When the power supply is failure or in overhaul,the two units will operate without start and stand-by power supply,their operation security will be impacted;and if the unit shutdown,it could not restart and could not generate the electricity.A reformation scheme was introduced in th...
Keywords:auxiliary power supply  standby power supply  be spare mutually  fast switchover