首页 | 本学科首页   官方微博 | 高级检索  
     

萧山临江工业园区临时码头行洪影响分析
引用本文:李志永. 萧山临江工业园区临时码头行洪影响分析[J]. 浙江水利科技, 2010, 0(5): 6-8
作者姓名:李志永
作者单位:浙江省水利河口研究院,浙江,杭州,310020
摘    要:萧山临江工业园区临时码头位于江道条件复杂多变的钱塘江尖山河段.工程实施后将占用一定的过水面积,对所在河段行洪产生一定影响.利用平面二维数学模型,分别对洪汛期和台汛期的水文工况计算后, 通过行洪影响和河床演变趋势变化的分析研究,从水位和地形2个方面评价可能造成的影响,为工程决策提供科学依据.

关 键 词:行洪  钱塘江  数学模型  码头

Flood Discharge Impact Analysis of Temporary Dock of Xiaoshan Linjiang Industrial Zone
LI Zhi-yong. Flood Discharge Impact Analysis of Temporary Dock of Xiaoshan Linjiang Industrial Zone[J]. Zhejiang Hydrotechnics, 2010, 0(5): 6-8
Authors:LI Zhi-yong
Affiliation:LI Zhi-yong(Zhejiang Institute of Hydraulics & Estuary, Hangzhou 310020, Zhejiang, China)
Abstract:The temporary dock of Xiaoshan Linjiang Industrial Zone will be located in Jianshan reach of the Qiantang River, whose water area will be partly occupied after the implementation of the project. A 2-D mathematical model was constructed to analyze flood discharge influence and riverbed evolution. The objective evaluation for the possible impact on water level and terrain could provide a scientific basis for decision-making of the project and be used as reference for evaluation of flood discharge influence on tidal rivers.
Keywords:flood discharge  Qiantang River  mathematical model  dock
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号