首页 | 本学科首页   官方微博 | 高级检索  
     

寺河矿三水沟回风立井揭煤施工实践
引用本文:马志远.寺河矿三水沟回风立井揭煤施工实践[J].煤炭科学技术,2008,36(9).
作者姓名:马志远
作者单位:晋城无烟煤矿业集团有限责任公司,山西晋城048006
摘    要:寺河矿西井3号煤层具有突出危险性.在西井三水沟回风立井揭穿3号煤层过程中,为消除突出隐患,制定并实施了三水沟回风立井井筒揭露煤层方案.当井筒工作面施工至距煤层垂距10 m时打前探钻孔,查明煤层赋存情况,测定煤层瓦斯压力,根据测定结果进行瓦斯抽放.当工作面掘进距煤层垂距2 m时,再次施工测压钻孔,采用钻屑瓦斯解吸指标法预测工作面有无突出危险性.当指标均小于临界值具备震动爆破揭煤条件时,采用震动放炮揭过煤层.按照上述施工方案与工艺顺利完成了探揭煤施工,确保了井筒揭煤安全.

关 键 词:回风立井  突出煤层  瓦斯抽放  揭煤施工

Practices on seam opening construction in Sanshuigou Mine air return shaft sinking of Sihe Mine
MA Zhi-yuan.Practices on seam opening construction in Sanshuigou Mine air return shaft sinking of Sihe Mine[J].Coal Science and Technology,2008,36(9).
Authors:MA Zhi-yuan
Affiliation:MA Zhi-yuan (Jincheng Anthracite Coal Mining Group Corporation Ltd.,Jincheng 048006,China)
Abstract:The No.3 seam in west mine shaft of Sihe Mine had an outburst danger.During the excavation operation of the Sanshuigou mine air return shaft passing through No.3 seam,in order to eliminate the outburst danger,a seam opening operation plan was set up and implemented for the Sanshuigou mine air return shaft.A pilot borehole drilling operation was conducted when the mine shaft working face with a vertical distance of 10 m to the seam in order to clarify the seam deposit conditions and to measure the seam gas p...
Keywords:mine air return shaft  outburst seam  gas drainage  seam opening construction  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号