清江隔河岩电站导流隧洞施工
引用本文:王仲何. 清江隔河岩电站导流隧洞施工[J]. 人民长江, 1997, 28(8): 12-14
作者姓名:王仲何
作者单位:长江水利委员会设计院施工处
摘    要:清江隔河岩电站导流隧洞施工具有开挖断面大、地质条件复杂,工期紧的特点,于1987年1月15日开工,同年12月15日完工通水,总工期仅11个月,创造了国内大型导流隧洞快速施工的新水平。在洞内最大过水流速转18m/s的条件下,通过采取措施,成功地将灰岩段顶拱钢筋混凝土衬砌改用锚、喷衬护,经过水考虑、锚、喷衬护未发生任何损坏。

关 键 词:导流隧洞 隧洞衬砌 锚喷支护 水电站

Construction of river diversion tunnel of Geheyan Project
Wang Zhonghe. Construction of river diversion tunnel of Geheyan Project[J]. Yangtze River, 1997, 28(8): 12-14
Authors:Wang Zhonghe
Affiliation:Wang Zhonghe
Abstract:The diversion tunnel of Geheyan Project is featured by large excavated section and complicated geologic conditions. It began to be constructed on January 15, 1987, and was completed and put in use on December 15, 1987, creating new level of quickly constructing large diversion tunnel in China. The maximum velocity of water flow passing through the tunnel is up to 18 m/s. The crown of tunnel section located in limestone stratum is lined with anchorage bar and shotcrete instead of reinforced concrete, and any damage was not discovered on the liner during diversion period.
Keywords:Diversion tunnel Tunnel lining Anchorage and gunite support Geheyan Hydropower Station