首页 | 本学科首页   官方微博 | 高级检索  
     

预制PHC管桩在应用中存在的问题及对策措施
引用本文:岳海山. 预制PHC管桩在应用中存在的问题及对策措施[J]. 山西建筑, 2010, 36(7): 75-76
作者姓名:岳海山
作者单位:山西潞安工程有限责任公司,山西,长治,046102
摘    要:针对应用预制PHC混凝土管桩施工中出现的问题进行原因分析并采取有效的对策措施,取得了良好的效果,从而加快基础施工进度,改善桩基施工现场文明施工环境。

关 键 词:预制PHC管桩  应用  存在问题  原因分析  对策措施

The existing problems in the application of precast PHC tubular piles and their countermeasures
YUE Hai-shan. The existing problems in the application of precast PHC tubular piles and their countermeasures[J]. Shanxi Architecture, 2010, 36(7): 75-76
Authors:YUE Hai-shan
Affiliation:YUE Hai-shan
Abstract:This paper carries out a cause analysis for the problems occurred in the construction process of precast PHC concrete tubular piles application and brings up effective countermeasures,whose effects are quite satisfactory,which will quicken the pace of infrastructure construction,improve the working conditions of the construction sites and better the construction environment.
Keywords:precast PHC tubular piles  application  existing problems  cause analysis  countermeasure  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号