首页 | 本学科首页   官方微博 | 高级检索  
     


SULTAN test facility: Summary of recent results
Authors:Boris Stepanov  Pierluigi Bruzzone  Kamil Sedlak  Giancarlo Croari
Affiliation:EPFL-CRPP, Fusion Technology, 5232 Villigen, Switzerland
Abstract:The test campaigns of the ITER conductors in the SULTAN test facility re-started in December 2011 after three months break. The main focus of the activities is about the qualification tests of the Central Solenoid (CS) conductors, with three different samples for a total six variations of strand suppliers and cable layouts. In 2012, five Toroidal Field (TF) conductor samples have also been tested as part of the supplier and process qualification phase of the European, Korean, Chinese and Russian Federation Agencies.A summary of the test results for all the ITER samples tested in the last period is presented, including an updated statistics of the broad transition, the performance degradation and the impact of layout variations.The role of SULTAN test facility during the ITER construction is reviewed, and the load of work for the next three years is anticipated.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号