铜街子水电站河道截流实施方案的优化
引用本文:刘茂森. 铜街子水电站河道截流实施方案的优化[J]. 四川水力发电, 1992, 0(4)
作者姓名:刘茂森
作者单位:水电七局
摘    要:本文重点阐述了铜街子水电站河道截流方案的优化内容,以及考虑问题的方法和原则,并介绍了截流工程的实际实施情况,最后还将原型实测参数与事后验证模型试验得出的参数进行对照。

关 键 词:铜街子水电站  优化方案  立堵法截流  围堰

Optimization of River Closure Schemes in Tongjiezi Project
Liu Maosen. Optimization of River Closure Schemes in Tongjiezi Project[J]. Sichuan Water Power, 1992, 0(4)
Authors:Liu Maosen
Affiliation:The 7th Hydroelectric Engineering Bureau
Abstract:This paper focuses on optimization of river closure alternatives of Tongjiezi project, the way and principles for considering problems. The construction of river closure works is introduced. The measured parameters of prototype testing are compared with that obtained from model tests afterwards.
Keywords:Tongjiezi Hydropower Station   optimized scheme   end dumping method for river closure   cofferdam.