首页 | 本学科首页   官方微博 | 高级检索  
     

松河隧道进口段施工地质超前预报
引用本文:张五洲,曾晋. 松河隧道进口段施工地质超前预报[J]. 山西建筑, 2011, 37(10): 178-179
作者姓名:张五洲  曾晋
作者单位:1. 贵州省交通科学研究院,贵州,贵阳,550000
2. 成都理工大学工程技术学院,四川,乐山,614007
摘    要:针对松河隧道进口段地质条件较差的情况,选择地质雷达并配合相关数据分析软件对该隧道进口段实施地质超前预报,分析了进口段掌子面前方围岩地质情况,并提出相应的安全施工措施,以确保隧道开挖的顺利进行。

关 键 词:隧道  掌子面  地质超前预报

On geological predicting of construction at inducer of Songhe tunnel
ZHANG Wu-zhou,ZENG Jin. On geological predicting of construction at inducer of Songhe tunnel[J]. Shanxi Architecture, 2011, 37(10): 178-179
Authors:ZHANG Wu-zhou  ZENG Jin
Affiliation:ZHANG Wu-zhou ZENG Jin
Abstract:Aiming at the weak geological conditions in the inducer of Songhe tunnel,the paper selects the geological radar and undertakes the geological predicting on the inducer of the tunnel by combining with the relative data analysis,analyzes the geological situation of the frontier surrounding rock of the working face at inducer,and points out the respective safety construction measures,so as to ensure the smooth operation in the tunnel excavation.
Keywords:tunnel  working face  geological predicting
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号