首页 | 本学科首页   官方微博 | 高级检索  
     

西安地铁钟楼站降水方案选择与实施
引用本文:王俊.西安地铁钟楼站降水方案选择与实施[J].山西建筑,2011,37(10):56-58.
作者姓名:王俊
作者单位:西安市地下铁道有限责任公司,陕西,西安,710016
摘    要:降水是地铁施工过程中的一个重要环节,也是安全施工的保障,结合西安地铁2号线钟楼站降水的工程实践,在多层地下水和含有砂层的情况下进行了降水方案的选择,阐述了周边重要建筑物的保护以及地下水监测及沉降监测等施工技术,可对类似工程的设计和施工提供指导。

关 键 词:地铁  降水方案  选择与实施

Dewatering scheme selection and implementation at Xi'an subway Zhonglou station
WANG Jun.Dewatering scheme selection and implementation at Xi'an subway Zhonglou station[J].Shanxi Architecture,2011,37(10):56-58.
Authors:WANG Jun
Abstract:Dewatering is a significant part in subway construction,is also the guarantee of safe construction.Combining with Xi'an subway No.2 line Zhonglou station dewatering project practice,it selects the dewatering program under the condition of multi-layer structural groundwater with sand layer,expounds the construction technology including surrounding important buildings protection,groundwater detection,and settlement detection and so on,which can provide guidance for similar engineering design and construction.
Keywords:subway  dewatering scheme  selection and implementation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号